Skip to main content
Logo icon

Main navigation

  • Home
  • News
  • Meet your MP
  • Government Support - Cost of Living
  • In Parliament
  • Campaign Responses
  • Contact
Logo icon

HS2

  • Tweet

Thank you for contacting me about HS2.

Following the recommendations of the independent Oakervee review on the benefits and impact of HS2, the Prime Minister gave the go ahead to HS2 alongside major improvements to local transport networks across the country. Construction work on Phase One of HS2 has now commenced, while Phase 2a has also achieved royal assent.

HS2 will form the backbone of the UK’s transport network, delivering a significant increase in rail capacity, with hundreds of thousands of extra seats. It will cut journey times, bring our biggest towns and cities closer together, enhance North-South connectivity, boost productivity in the Midlands and the North, and crucially it will help to spread prosperity more evenly across the country. HS2 will also play an important role in delivering the Government’s net zero carbon objectives.

Let me be clear that this is not an either / or decision between HS2 and improving the rest of the existing rail network, in particular local services in the Midlands and North. HS2 is in fact integral to giving the regions the fast connections they need.

I have been reassured that Ministers will work hard to speed up the delivery of Northern Powerhouse Rail. More broadly, ‘High Speed North’ will be established to ensure an integrated, effectively sequenced plan to make sure the North and Midlands have the rail capacity and connections they need – east to west and north to south.

I am also particularly pleased about the Government’s determination to see a line drawn under the failures of HS2 Ltd.’s management, transparency and cost control to date. A dedicated Minister with specific responsibility for oversight and accountability of HS2 has been appointed and they will present regular reports to Parliament to enhance transparency.

HS2 Ltd.’s role will also change. The complex Euston station element will become the responsibility of a new body, as will the design and construction of Phase 2b. This will enable HS2 Ltd to focus its energies on delivering Phases 1 and 2a successfully.

Oakervee Review: I understand that Ministers carefully considered the conclusions of the Oakervee review’s report before taking the decision to press ahead with HS2. The review was tasked with testing the existing evidence to produce an assessment that would allow the Government to make a fully informed decision about whether or how to proceed with the project. A panel of experts who represented a range of views supported the review to ensure an independent, thorough and objective assessment of the project.

Amongst other things, the review considered the case for high speed rail, how a new high speed rail line could benefit the UK economy, the design and specification of the HS2 project, how it linked to the existing rail network and other transport projects, the costs of the project and the impact of cancelling all or part of the scheme. The review recommended proceeding with HS2, but with reformed scrutiny and oversight to protect the interest of passengers and taxpayers.

Costs: I believe the enormous potential of HS2 for the whole nation outweighs its costs. I welcome that the Infrastructure and Projects Authority believes Phase 1 of HS2 can be delivered within its current projected cost of £35-£45 billion in today’s prices. The Full Business Case for Phase One was approved in April this year which included a robust cost-benefit analysis. Current costs will also be interrogated to identify where savings can be made. Indeed, HS2’s benefits must be matched by tight cost controls going forwards. I am pleased that Parliament will receive regular 6-monthly progress reports, the first of which is due later this year, which will set out the latest cost and schedule position.

Cost Increases (October 2020 Report): You may be aware that the Government has committed to providing an update to Parliament every six months on the progress of HS2, the first of which was published in October 2020. It was reported that various areas of concern had been identified, amounting to cost pressures of £800 million. As I understand it, these are to be managed within the project’s dedicated contingency fund of £5.3 billion. The target cost available includes this delegated contingency, for managing the risk and uncertainty that are an inherent part of delivering a major project, such as HS2. As such, I continue to believe that there is enormous potential in HS2 for the whole nation, which outweighs its costs. HS2 will be vital in bringing our biggest cities closer together, and levelling up the economy to bring new opportunity to people across the country. 

Alternatives to HS2: The West Coast Main Line is currently at breaking point and is unable to cope with the growth in demand. However, simply upgrading the West Coast Main Line would not provide a lasting solution. It is estimated that even an upgrade which prioritised boosting capacity to commuter and intermediate destinations with new rolling stock and infrastructure upgrades would only produce benefits up to the mid-2030s if demand on the line continues to grow at its current rate. Indeed, demand could increase by approximately 80 per cent in the next 15 years (before the full HS2 network is opened). This type of upgrade would also involve substantial costs and be hugely disruptive for passengers over a prolonged period.

Furthermore, there are currently no shovel-ready alternative investments to HS2 in the existing network, and years would be needed to identify and develop new proposals.

Wider rail investment excluding HS2: Excluding HS2, the Government will still make a record £47.9 billion available for the rail network between 2019 and 2024. Indeed, this is the biggest investment in the railways since Victorian times. It will see commuter and main line routes being upgraded, the introduction of thousands of new carriages and reliability improved. I am pleased that the Government has also committed £500 million to drive forward the process of reconnecting communities cut off from the network by the controversial Beeching cuts.

HS2 & Jobs: I understand that HS2 Ltd and its contractors are saying that they expect to recruit around 22,000 roles over the coming years to help build the Phase One section of the route. I welcome that HS2 Ltd has already engaged with thousands of British businesses, to aid them in winning work on the HS2 project. So far around 95 per cent of businesses that have already delivered works for HS2, awarded directly and through the supply chain, have been won by British companies, with many more opportunities to come in the future.

HS2 Eastern Leg: You may be aware that the HS2 planned routes are separated into various phases. The route for Phase 1, from London to the West Midlands, has been confirmed, and work is already well underway. Legislation for Phase 2a, from Birmingham to Crewe, received royal assent in February. Phase 2b comprises of two proposed ‘legs’ to the Phase 2 route; the eastern leg from the West Midlands to Leeds, and the Western leg from Crewe to Manchester. As I understand it, the Phase 2b routes are yet to be confirmed and may change.

I welcome that the Government has made clear its commitment to delivering HS2 Phase 2b and transformational rail improvements. The Government has also accepted the findings of the Oakervee Review, which concluded that Phase 2b needs to be considered as part of an Integrated Rail Plan for the north and Midlands which also includes Northern Powerhouse Rail, Midlands Rail Hub, and other major Network Rail schemes to ensure these are scoped, designed, delivered, and can be operated as an integrated network. I understand that the Integrated Rail Plan, drawn up by the Government, alongside HS2 Ltd and local leaders, will published later this year, and will consider how best to do this. It is my hope that this will allow the Government to fulfil their commitment to bring forward transformational rail improvements along the HS2 route as quickly as possible, and I will continue to monitor this situation closely.

HS2 and the Environment

HS2 will play an important role in the UK’s transition to a net-zero carbon economy by 2050. I understand that HS2 will offer some of the lowest carbon emissions per passenger km, seven times less than passenger cars and 17 times less than domestic air travel in 2030. Indeed, HS2 is expected to help reduce the number of cars and lorries on the road and cut demand for domestic flights.

It is estimated that the total carbon emissions produced by both constructing and operating Phase One for 120 years would be the same as just one month of the UK's road network.

I am also pleased that a green corridor will be created alongside the railway. This will involve the planting of seven million new trees and shrubs, including over 40 native species, along the Phase One route from London to the West Midlands.

It is welcome too that an overall £70 million funding package has also been made available to enhance community facilities, improve access to the countryside, and help improve road and cycle safety in towns and villages along the HS2 Phase One route.

Ancient Woodland: There are approximately 52,000 ancient woodland sites across England, and of these, 43 will be affected by Phases One and 2a of HS2. It is worth noting that more than 80 per cent of the total area of these 43 sites will be untouched by HS2 and remain intact.

I want to reassure you that HS2 is using a combination of approaches to compensate for the ancient woodlands lost during construction. This includes translocation of soil to other woodlands to improve their biodiversity, planting new woodland and restoring existing ancient woodland.

The HS2 Woodland Fund – overseen by the Forestry Commission – funds projects to support the creation, restoration and enhancement of woodland on private land or in partnership with multiple landowners. I understand that the Government has committed £7 million to establishing this Fund, and that the first £1.6 million for Phase One has already been allocated to supporting approximately 115 hectares of new native woodland creation, and the restoration of around 160 hectares of of plantations within ancient woodland sites.

Nesting Birds: I appreciate your concerns about habitat clearances, and I can reassure you that HS2 Ltd and its contractors are obliged to comply with all relevant legislation on nesting birds. 

Indeed, all birds, as well as their nests and eggs, are protected under the Wildlife and Countryside Act 1981 (as amended) and all HS2 vegetation clearance is accompanied by measures to prevent any breach of the law. When habitat clearances need to be undertaken during bird nesting season, these clearances are carried out in accordance with guidance from trained ecologists, in line with Natural England guidance.

A Working Method Statement is completed before clearance work starts and appropriate ecological supervision is also provided. Work can also only commence when an ecologist has finished a pre-commencement site survey and given a Permit to Clear. All work needs to be monitored by the on-site ecologist, and the ecologist can halt works if necessary.

Buffer Zones are implemented if breeding birds are present during works, to allow work to continue in the surrounding area.

Thank you again for taking the time to contact me.

Craig Whittaker MP

August 2021

Campaign Responses

  • Archived Campaign Responses
  • Covid-19: Extending Support Schemes
  • Covid-19: Provision of Tests
  • Covid-19: Vaccinating Children
  • Covid-19: Vaccines and Developing Countries
  • Abortion At Home
  • Abortion Time Limit: Foetal Viability
  • Aid Spending
  • Animal Research
  • Animal Sentience: Update January 2022
  • Animal Welfare
  • Assisted Suicide
  • Asylum Seekers: Employment
  • Badgers and Bovine TB
  • Beer and Alcohol Duty (incudes Draught Beer)
  • Business, Human Rights and Environment: June 2022
  • Caged Farm Animals
  • Cambo & Oil Fields
  • CatchUpWithCancer
  • Cats & Kittens
  • Channel 4 Privatisation
  • Clean Air
  • Clean Heat: Heat Pumps
  • Clean Heat: Energy Efficiency
  • Climate and Ecological Emergency Bill
  • Climate Issues (plus COP 26)
  • Commercial Sexual Exploitation
  • Conversion Therapy
  • COP26: Global Action
  • Cost of Living
  • Council Workers' and Public Sector Pay
  • Cut Carbon Not Forests: Update
  • Cycling and Walking: Update
  • Dangerous Dogs Act
  • Debt and DROs
  • Decarbonisation and Economic Strategy Bill
  • Dementia Diagnosis
  • Dentistry
  • Deporting Foreign Criminals: June 2022
  • Disability Benefits Assessments: EDM 19
  • Domestic Abuse Bill
  • Domestic Abuse: Migrants
  • Domestic Homicide
  • Domestic Abuse: Universal Credit
  • Early Years Funding
  • Elections Act and the Electoral Commission
  • End Child Food Poverty
  • Endometriosis and PCOS
  • Energy Costs and the Windfall Tax
  • Environmental Land Management
  • E-scooters (Guide Dogs)
  • Equal Pay
  • EU/EEA Settled Status
  • Face Coverings
  • Fire & Rehire
  • Fix Bad Housing
  • Flexible Working
  • Foie Gras and Fur
  • Food Waste
  • Fuel Duty and Prices
  • Gamebird Battery Cages
  • Gambling Review
  • Gender Recognition Act: June 2022
  • Global Malnutrition
  • Global Partnership for Education
  • GP Issues
  • Guards’ Bearskins: Updated June 2022
  • Hamas
  • Health & Care Bill (including Workforce)
  • Heart and Circulatory Diseases
  • Hedgehogs
  • Hedgerows
  • Holiday Tax Lets
  • HS2
  • Human Rights Act
  • Human Rights Defenders
  • Humanist Marriages
  • Hunting Act
  • Immigration and Refugees
  • Israel is not an Apartheid State
  • Israel: Stop BDS
  • Israel: UK Arms and Right to Self-defence
  • Ivory Act: Update
  • Jagtar Singh Johal
  • Legal Aid: Asylum and Immigration Cases
  • Levelling-up: Transport
  • Live Animal Exports
  • Local Electricity Bill
  • Medical Cannabis
  • Mental Health Research
  • Migrant Channel Crossings
  • Misogyny
  • MP's & Second Jobs
  • Multi-sensory Impairment: Education
  • National Insurance Increase (NHS & Social Care)
  • Nationality and Borders Bill: Asylum-seekers
  • NHS Funding
  • NHS Pay: Consultants, Doctors and Dentists
  • NHS Pay and Recruitment
  • Night Time Industries
  • Northern Ireland Protocol
  • Nuclear Weapons
  • Ocean Protection
  • Off-payroll Working (IR35)
  • Older People: Health and Care
  • Palestinian Human Rights Defenders
  • 'Partygate': Fixed Penalty Notices
  • Peat
  • Pension Credit
  • Pensioner Poverty
  • Persecution of Christians: Updated May 2022
  • Planning Bill
  • Plastic Waste
  • Police Corruption & Accountability
  • Police, Crime, Sentencing and Courts Bill: February 2022
  • Pregnancy and Maternity Redundancy Bill
  • Proportional Property Tax
  • Public Sector Pay (Civil Service)
  • Public Sexual Harassment: Crime not Compliment (Jan 22)
  • Rail Strikes
  • Rape and the Criminal Justice System
  • Reception Baseline Assessment (Primary Schools)
  • Renters Reform Bill: Updated
  • Retail Workers: Protection at Work
  • Royal Corruption
  • Rwanda Partnership: Tackling Illegal Immigration and People Smugglers
  • School Breakfast Bill
  • Sentencing (Dangerous Driving)
  • Sewage Discharges
  • Small Brewers Relief
  • Snares
  • Social Care Charging Reforms
  • Social Housing
  • Speed Limits
  • Stamp Duty Land Tax
  • Syria
  • Teachers' Pay
  • Trade Deals: Farming and Food Standards
  • Trade Deals: Food Standards
  • Trade Deals: NHS - New Clause 17 and Lords 11
  • Trade Deals: Parliamentary Scrutiny
  • Trains and Planes
  • Triple Lock (State Pension)
  • Trophy Hunting Update
  • Trespass (Right to Roam)
  • Ukraine
  • Ukraine: Refugees
  • UN Treaty on Business and Human Rights
  • Unaccompanied Child Refugees
  • Universal Credit
  • Vagrancy Act and the PCSC Bill (Lords Amendment)
  • Vaping and E-Cigarettes
  • VAT on Electric Vehicle Charging in Public Places
  • Violence against Women and Girls
  • Visa-free Work Permits for Touring Artists
  • Voting Systems
  • Water, Sanitation and Hygiene (UK Aid)
  • Wayne Couzens Inquiry
  • Young People's Mental Health
  • Youth Homelessness: Chance to Move On

Craig Whittaker MP for Calder Valley

Footer

  • About RSS
  • Accessibility
  • Cookies
  • Privacy
  • About Craig
  • Campaign Responses
  • In Parliament
This website is funded by the Independent Parliamentary Standards Authority (IPSA) for the purpose of assisting Craig Whittaker MP in the performance of their Parliamentary duties.
Copyright 2022 Craig Whittaker MP for Calder Valley. All rights reserved.
Powered by Bluetree